Today has been a very wet day for Hershey and the surrounding areas. Flooding was the big theme and the Skyrush construction site was not missed. These photos were taken around 12pm and just before a big downpour that lasted most of the afternoon.

If you look to the bottom of the picture you can see part of the old wall that surrounded the lake before construction began. The temporary dam and much of the construction site is underwater.

The water looks pretty deep.

Many of the construction vehicles have been parked along this hillside to try to escape the water.

This is a perfect example to show why the footers are so high.

Progress is being made on the other side of the creek, but it’s hard to tell how much.

It looks like, at the time that this photo was taken, that this is what the lake was before construction.

That’s all for now.

About these ads
This entry was posted in Hersheypark News by ccron10. Bookmark the permalink.

About ccron10

Keystone Thrills started in the summer of 2009 when the fansite Hersheypark Crazy and a lesser-known site called ccron10 media joined together. The site first started out as a community forum group and has grown from there. Today, Keystone Thrills is dedicated to providing it's readers with the latest updates and news from parks such as Knoebels, Hersheypark, Dorney Park, and many more.

2 thoughts on “Hersheypark Skyrush Update #40 (9/7/11)

  1. Pingback: Anonymous

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s